demolition of garage at 20 Byron Avenue prior to comencment
extension built in keeping with existing house using reclaimed roof tiles
rear of extension built in keeping with existing house ,and three velux letting light into new kitchen area
Rubberiod roofing,photo taken prior to pointing and flashing of roof verge and abbutment
finished kitchen 20 Byron avenue
Mr&Mrs Martin farnborough
Job consisted of lowering existing floor level by 800mm so we could drop existing fist floor joist height by 800mm and also dropping existing loft floor by 800mm to accomodate a new loft conversion ,also as you can see removed existing ground floor wall
Concrete pump
We built brick work to match existing in English bond and fitted doors
roof carcass note the steel R,S,J above the door we drilled and tap threded this to attach the big doors to,you can also see new floor joists above to form new first floor
Plastered and painted with a good base coat
Electric remote Velux roof windows ,Utility room in foreground also has Velux . Building supported on 180mm post on top of an exspansion plate 1800mm4 concrete pad x
Finished including cobbling and planter walls
existing flat roof to rear of property converted in to living space rear of property phase 1
as you can see we tiled the back first before we tied in to the front in order to keep the occupants below weathered
Rear of phase 1 tile hanging to rear (Sorry photo is a bit dark )
installation of stud walls to for two new bedrooms two bathrooms and a study
as you can see the roof was formed using steel cranked beams load bearing on pads to existing external walls
please note fresh plastering not yet dry in these photos
Mr&Mrs sharp Wonersh Guildford ,Phase two extending out the front to form one of the new bedrooms and one new bathrooms using steel and timber framing front wall and tile hanging
Front phase 2 nearly complete due to planning height restrictions top of roof was sealed using sarna ruberiod roof system ,
two storey extension with knock through we took out the back of the house on the ground floor and installed load bearing steel
Mr&Mrs Gurung farnborough
Completed from start to finish in seven working weeks including granite patio and brick edge to match house
single story extension for Mr&Mrs lewis fleet hampshire
due to soft ground conditions we piled the foundations to a depth of six meteres
we used recycled tiles on the roof as requested by the customers, matching the existing roof making the extension look like it had always been there
Mr&Mrs james frimley green extension re roof and renovation ,we are still working on this job so finish photos soon
completed roof
dormer window construction ,loft conversion for Mr&Mrs nee Epsom
Stairs we fitted to new loft conversion Epsom we ( We can build supply and fit any type of staircase you should require)
making the best of the space we installed new L shaped bathroom located to the left at the top of the stairs in photo above
as looking through door loo to right of photo as in photo above
decking to rear of house built with loft conversion above Epsom
Knock through where was a window and installation of french doors Epsom job
knock through were was small window and small kitchen door and construction of new cambered brick arch and brick reveals ,Including new raised decking and installation of electric awning
job for Mr&Mrs Ballard Balham
Mrs drew Church Crookham Garage -Barn conversion
Bespoke Stair case fitted
Mr&Mrs Mullen Alderbrook Cranliegh
Job consisted of renovation of stable block loft conversion and small rear extension and enabling works
front of courtyard (we are awaiting further photos )
Mr&Mrs Palmer Petersfield rear extension and knock through with bespoke double glazed roof hip
Viewed from the kitchen